Work completed between July 16th - August 12th, 2010
- Sandstone patio
- Installation of long awaited sliding glass doors with flush triple track system
- Tiled basement & extension kitchens, bathrooms & utility rooms
- Laid, sanded & varnished parquet floors
- Painted basement bedroom, lvg space, bathroom, utility room & kitchen
- Painted mezzanine level bay window bedroom (not pictured)
*************************
We're almost done!! 13 days to completion!!!!!!!!
*************************
Newly plastered walls AND screed flooring completed
entrance area to basement freshly plastered
(skylight above this alcove area)
Alcove area (looking with basement bedroom at back)
under arch to the left is the doorway into the den area of extension
Basement: alcove area to right and this room is a bedroom space
Basement: looking from bedroom into
open-plan kitchen/living space
Basement: lvg space/open-plan kitchen
(utility room to right)
Basement: open-plan kitchen & lvg space
Front door entrance to basement
Front of house (basement entrance - old PVC door)
Antonio removed the old institutional-looking
wrought iron railing and what a difference it has made!
Front entrance to basement:
Well area - Black sandstone coping stones to be
laid by Antonio on top of well walls
To be rendered & painted white on Aug. 17th
Base of well area to be tiled with black quarry tiles
Improved garden & newly laid patio
(view from first bedroom floor window)
Full view of patio from inside extension before sliding doors
are installed (kitchen space to right)
External view looking in to kitchen space (left) from patio
(I love my flush floor level with patio!)
Lovely kitchen space with very appealing
orange waste pipe (it's the 2010 "in" colour for plumbing
pipes :) the den is in the background (right)
Laying out planks and organising wood scheme
for the den and extension areas
3/4 finished laying wood floor
(sliding doors were installed!)
Newly laid Iroko hardwood flooring in the
den & extension
Newly laid Iroko hardwood flooring first pass with sander
Completion of first pass of sander
(our fantastic flush floor & tracking system with sliding glass doors)
Den (bathroom & utility rooms thru door on right)
repeat
- the last remaining staircase to be sanded and varnished
- new under-the-stairs cabinetry
Looking forward to August 25th, 2010!!!!!!!!