Monday, 9 November 2009

Sanding the floors, tiler tiling 1st floor bathroom and moving in!!!

August 23-25th, 2009

below: Antonio covering newly sanded floor before we move in.
location: second bedroom

below: floor sample

below: We have moved in!! Boxes, boxes and more boxes...

below: Before & after floorboards
below: Antonio hard at work sanding the floorboards before our moving in date!

below: sanded floorboards in second bedroom, 1st floor


below: Reception room new bay sash windows!!!
below: Look down at Mezzanine level - new stud walls for bedroom and bathroom

below:
second bedroom new sash windows and dry plastered walls

below: bedroom - laying floorboards and repairing the damaged before our move in date