Photos below: August 19th, 2009 - Ground Floor & entrance hallway - new joists with ply floor laid. All walls removed and original plaster ceilings demolished and rubble removed.
Below: First floor - new insulation & plaster boarding
top - (from hallway looking into Master bedroom) New insulation (I did that myself - super itchy job!)
below: 1st floor - Insulation
Photo top: 1st floor landing & corridor (looking into bathroom and down into bedroom 3)
Photo bottom: 1st floor bathroom
Photo below: 1st floor - 3rd bedroom --> new insulation & plaster boards
Photos below: August 20th, 2009
Photo top: Master bedroom stripped of original floorboards
Photo bottom: 1st floor 2nd bedroom new plaster boarded ceiling
Photos below: new plasterboards
Photo top: looking at 1st floor landing & Master bedroom entrance (centre right) & 2nd bedroom (left)
Photo bottom: looking into 1st floor 3rd bedroom & bathroom to the right
Mezzanine level - Guest bedroom 1 (at the time of the photo is served well as a storage room)
Mezzanine level - Guest bedroom 1 (at the time of the photo is served well as a storage room)
Photos below: August 21st, 2009
1st Floor Master bedroom: New plaster!!!!!!!!
That's Wayne, one of our amazing plasterers! He can turn plaster into a mirror of glass!!
Photos below:
top: 1st floor landing - plasterboarding the bathroom and bonding the wall to the right in preparation for plaster and skim.
bottom: Carpenter beginning to open the original window in the 1st floor bathroom.
Mezzanine level: Opening of new window in Mezz. bathroom (left)
Looking left, note the green poles (acros), they were used to support joists we opened on of the original windows. This window is directly below the 1st floor window (photo above). This area to the left is to become the Mezzanine level bathroom.
Photos below: August 21st, 2009
1st floor Master bedroom
top photo: Master bedroom