Some of you already know about the build, but for others that don't I'll fill you in on our most pressing issue to date.
It is Tuesday, November 10th, 2009 and we are still without heat in the house. Until last Sunday we were living without heat, PLUS two major holes with drafty air streaming inside. Now we are simply living without heat and only small holes in various locations. Therefore, the two photos below are a real advancement in our renovation project, and we've decided they deserve their own post on our blog :)
Really interesting pictures (heavy sarcasm), but this is another milestone for us.
The two windows that have been open holes for roughly 3 months have finally been installed with proper wood casement windows, insulation and bricked in properly (we hope). No more showers with cold drafts coming through (again, we hope).
below: (left) 1st floor bathroom window & (right) mezzanine level bathroom window
Ahhh...again, we love each challenge that comes with climbing any hill or mountain in order to make this a successful renovation project, but heat will bring us to the bliss stage in our project. Heat is scheduled (in theory) for November 13th, 2009!!!!!!!!
No comments:
Post a Comment